Headworks and Headrace Alignment of Tamor-Mewa Hydroelectric Project (128 MW)
Construction of civil works at headworks and headrace alignment of the 128 MW Tamor-Mewa Hydroelectric Project.
Ghodatabela, Langtang, Rasuwa
Construction of High Altitude Bridge (Steel truss bridge 27 m span, 2 m wide) at Ghodatabela, Langtang, Rasuwa.
Construction of civil works at headworks and headrace alignment of the 128 MW Tamor-Mewa Hydroelectric Project.
Dailekh District
Upgrading of the Rawatkot–Ramghat road section (Km 13+300 to 29+168) to blacktopped standard in Dailekh.
Civil works of the 86 MW Solu Khola (Dudhkoshi) Hydropower Project.